Plan the cable routes before installation
A useful cabling plan starts with your floor layout, device locations and how the space will be used. We review cable pathways, network rack locations and access to ceilings or other work areas. Share any building requirements and the work being handled by your electrician, general contractor or IT team so responsibilities are clear before installation.
Cabling for new spaces and existing buildings
For an office move or new restaurant, we can plan network connections alongside the buildout. In an occupied warehouse or existing office, the scope may include new drops, fiber links, changes to the rack or replacement of disorganized cabling. Installation timing and access requirements are agreed as part of the project.
Cat6, Cat6A or fiber?
The right cable depends on distance, expected network speeds, equipment and the installation environment. Cat6 and Cat6A are options for wired network connections and compatible PoE devices. Fiber can connect separate network locations where distance or bandwidth needs call for a different approach. We review the requirements before recommending a design.
What to include in your quote request
Send the project ZIP code, property type, approximate number of connections and where the equipment will be located. Floor plans, photos of the current rack and your target completion date help us understand the work. Tell us whether you need cabling only or a complete network installation with equipment and configuration.